The Project

A comprehensive exterior restoration designed to last decades.

Years of Southern California sun, seasonal rain, and everyday wear had begun taking their toll on the building envelope at Kellogg Terrace.

Aging siding, deteriorated structural wood, and areas vulnerable to water intrusion meant the community needed more than a fresh coat of paint — it needed a comprehensive exterior restoration designed to protect the property for decades to come. PrimeCo partnered with the HOA to deliver a full exterior renovation.

  • Full siding replacement
  • Weatherproof building wrap
  • Structural and deck wood replacement
  • Waterproofing at balconies
  • Complete exterior repaint
Understanding

Every great project starts with understanding.

Before a single board was removed, our team spent time understanding the property's existing conditions. Rather than rushing into construction, PrimeCo worked alongside the board and management to evaluate areas of deterioration, explain why repairs were necessary, and develop a clear scope of work.

That process allows boards, managers, and homeowners to move forward with confidence — not uncertainty.

Kellogg Terrace mid-project exterior
First Line of Defense

Rebuilding the envelope that protects everything beneath.

Exterior siding does much more than create curb appeal. It protects the structural framing beneath it from moisture, weather, and everyday exposure.

At Kellogg Terrace, deteriorated siding was carefully removed so our crews could inspect the underlying structure, replace damaged framing where needed, and install a new weather-resistant building wrap before new siding was installed. This critical layer helps prevent moisture intrusion while creating a more durable building envelope designed to perform for years to come.

Structural Integrity

Water often damages far more than what can be seen from the outside.

As construction progressed, PrimeCo replaced deteriorated structural lumber and repaired deck framing where necessary, restoring the strength and stability of the balconies while preparing the buildings for new finishes and waterproofing systems.

These repairs not only improve appearance — they help protect residents, preserve property values, and extend the life of the community.

On the Property

A closer look at Kellogg Terrace.

Kellogg Terrace 1
Kellogg Terrace 2
Kellogg Terrace 3
Protection

Protecting what was rebuilt.

Once structural repairs were complete, attention shifted toward long-term protection. Balconies received waterproofing repairs to help defend against future moisture intrusion — one of the leading causes of structural deterioration in multifamily communities.

The buildings were then finished with a complete exterior paint system, giving the property a fresh, updated appearance while providing another layer of protection against the elements.

Accountability

Accountability built into every phase.

Large HOA projects involve dozens of moving pieces. That's why PrimeCo builds accountability directly into the construction process. Before work begins, we conduct a detailed pre-construction walkthrough with the board and management team to align on the schedule, scope, and expectations.

Throughout construction, we return every two weeks for progress walkthroughs, reviewing completed work, discussing upcoming phases, and answering questions along the way. Everyone understands where the project stands because everyone sees the progress together.

"Each billing period is reviewed and approved before an invoice is submitted — the HOA pays only for work that has been completed."
Communication

Clear communication from start to finish.

Construction should never leave a board wondering what's happening on their property. Throughout the Kellogg Terrace project, PrimeCo kept managers and stakeholders informed through regular communication, progress updates, site documentation, and responsive project management.

For larger communities, PrimeTrack provides an additional layer of visibility by giving boards and managers one centralized place to follow schedules, review progress photos, access documents, and stay connected throughout the project.

Respect

Respecting the people who live there.

A construction project doesn't happen on an empty job site — it happens where people live. Our crews worked to keep work areas organized, minimize disruption whenever possible, and maintain clean job sites throughout construction.

At the completion of each workday, crews cleaned their work areas, and once the project was finished, PrimeCo performed a final walkthrough to ensure the community was left in the condition residents deserved.

Building Clients for Life

More than a refreshed exterior.

When the final coat of paint dried, Kellogg Terrace had a renewed building envelope, repaired structural components, improved waterproofing protection, and the confidence that comes from knowing the work was completed with transparency, accountability, and craftsmanship. That's what Building Clients for Life means to us — becoming a trusted partner that HOA boards and community managers can rely on for years to come.