Featured Case StudyStructural Rehabilitation · HOA Community
From Structural Concerns to Long-Term Confidence
An inside look at how PrimeCo restored aging balconies — from assessment and bi-weekly progress walks to transparent billing and a final walkthrough the whole community could stand behind.
Read the case study
ProjectHuntington Beach | 244 Units
Broadmoor Huntington Harbour
- •Full exterior repaint
- •Stucco repair and reconstruction
- •Wooden deck and stair repair
- •Repaired waterproofing on stairs
- •Complete rebuild of lagoon bridges
ProjectYorba Linda | 224 Units
Kellogg Terrace
- •Full siding replacement
- •Weatherproof building wrap
- •Structural and deck wood replacement
- •Full exterior paint
- •Waterproofing at balconies
ProjectLa Jolla | 18 Units
Village Point La Jolla
- •Full exterior repaint
- •Damage wood replacement
- •Stucco repair
- •Deck and stair coating
ProjectNewport Beach
Mariners Medical Plaza
- •Full replacement of T1-11 paneling with new Hardie lap siding
- •Full replacement of all trim with Hardie trim
- •Structural Wood replacement
- •Installation of fire and waterproof barrier under siding
- •Full exterior paint
- •New building signage
ProjectSan Diego | 330 Units
BLVD63 Apartments
- •Full exterior paint
- •Stucco repair
- •Wood replacement
- •Metal repair
- •Fireproof coating repair
- •Anti-graffiti coatings
ProjectLaguna Niguel | 264 Units
Mirador at Rancho Niguel
- •Full exterior repaint
- •Waterproof deck repair
- •Structural repair of carports
ProjectIrvine | 216 Units
Villa Siena Apartment Homes
- •Full Exterior Repaint
ProjectCarlsbad | 162 Units
Serrano at Rancho Carrillo
- •Balcony repair
- •Wood replacement
- •Installed new trex decking
- •Structural repair of posts and railings